Interested in a FREE Initial Design Consultation? Click HERE
Also including moving a wall and enlarging 2 entryways; new furnace installation; new water system from street to fixtures; custom cabinetry, counters, tile work, windows and backdoor installation; electrical including partial heated tile floor; uncovering and finishing original wood floor; painting and staining.
Everyone on project did EXCELLENT work. Design – Anne, Bradley, and Stephyn; wood working (on-site primarily done by Roger Muller; cabinets and windows custom made at Versatile); Project manager – Joe McAlester. Close attention to detail and quick response to a few design swerves.
Result: BEAUTIFUL, functional, and fun to work in!! All the folks who worked on the job were responsive, lovely to interact with and did fine work.
Julie
Oregon: CCB# 119917 | Washington: ARCIFL *910KJ